Skip to Content
Acronym: 
TREC Enforcement

Does TREC consider a roof with roofing felt ending short of the drip edge and the rake not overlapped over the drip edge a required reporting deficiency? If yes, is the inspector required to inspect 100% of the materials under the edge of the roof?